Author Archive of Steve-billington

Building Work update

Hi Everyone The outside Scaffold is just about finished for this section of work, that's the pointing, Rose window and roof. The inside is now starting to be built to enable the ceiling to be repaired Steve

Keep Reading
Building works update

  Hi The scaffold is increasing in height outside.    

Keep Reading
Phase 2 Building Works 2015

Hi Everyone As many of you might have already seen Phase 2 of the building works has started. This will start with:- Asphalting of the porch roof Repointing and brick repair of the south Elevation Lighting, heating and Power to the entrance area Plus starting next week the removal and renovation of the Rose Window. I'll take what pictures I can to show the progress, hope you enjoy them. Steve

Keep Reading
The Duchy of Lancasters Representative visits Dome of Home
DSC02331

            On Friday 3rdOctober, Peter Woods, deputy Lord-Lieutenant, representing Her Majesty's Lord-Lieutenant of Merseyside, Dame Lorna EF Muirhead DBE, presented a cheque for£2,000 towards the restoration of the church. During a tour of the heritage and restoration works, Mr Woods commented, “The Duchy of Lancaster Major Grants Committee decided to award this grant because this building means so much to the people

Keep Reading
Final Dome of Home Building work update

Hello Everyone Sadly this is the last Building work update as this phase of works is now complete. I hope I've been able to show you some of the works that you would not normally have been able to see. I've enjoyed doing it and I hope you have liked seeing the updates. The last update include views of the finished toilet including the new door and plastering around the new windows before the scaffold was removed and the finished but not painted

Keep Reading